This example demonstrates the use of Tcl programming in order to perform the nonlinear analysis. When dealing with nonlinear problems, the models do not always converge for the analysis options of choice. For this reason it is somtimes
This example demonstrates the use of Tcl programming in order to perform the nonlinear analysis. When dealing with nonlinear problems, the models do not always converge for the analysis options of choice. For this reason it is sometimes
necessary to step through the analysis, checking for convergence at each step and trying different options if the analysis fails at any particular step.  
necessary to step through the analysis, checking for convergence at each step and trying different options if the analysis fails at any particular step. This script makes use of the fact that many OpenSees commands actually return
values that can be used in the script.




Line 52: Line 53:


<pre>
<pre>
# set some parameters
set maxU 15.0;         # Max displacement
set maxU 15.0;         # Max displacement
# Perform the analysis
set ok 0
set ok 0
set currentDisp 0.0
set currentDisp 0.0
# perform the analysis
while {$ok == 0 && $currentDisp < $maxU} {
while {$ok == 0 && $currentDisp < $maxU} {


Line 72: Line 74:
       }
       }
     }
     }
    set currentDisp [nodeDip 3 1]
}
}
</pre>
</pre>

Revision as of 23:21, 25 April 2011


In this example the reinforced concrete portal frame which has undergone the gravity load analysis is now be subjected to a pushover analysis.

Files Required:

  1. RCFrameGravity.tcl
  2. RCFramePushover.tcl

NOTES: This example demonstrates the use of Tcl programming in order to perform the nonlinear analysis. When dealing with nonlinear problems, the models do not always converge for the analysis options of choice. For this reason it is sometimes necessary to step through the analysis, checking for convergence at each step and trying different options if the analysis fails at any particular step. This script makes use of the fact that many OpenSees commands actually return values that can be used in the script.


Model

The RCFrameGravity script is first run using the "source" command. The model is now under gravity and the pseudo-time in the model is 1.0 [= 10 * 0.1 load steps]. The existing loasd in the model are now set to constant and the time is reset to 0.0. A new load pattern with a linear time series and horizontal loads acting at nodes 3 and 4 is then added to the model.

# Do operations of RCFrameGravity by sourcing in the tcl file
source RCFrameGravity.tcl

# Set the gravity loads to be constant & reset the time in the domain
loadConst -time 0.0


# Define reference lateral loads for Pushover Analysis
# ----------------------------------------------------

# Set some parameters
set H 10.0; # Reference lateral load

# Set lateral load pattern with a Linear TimeSeries
pattern Plain 2 "Linear" {

        # Create nodal loads at nodes 3 & 4
	#    nd    FX  FY  MZ 
        load 3 $H 0.0 0.0 
        load 4 $H 0.0 0.0 
}

Analysis

For the Pushover analysis we will use a displacement control strategy. In displacement control we specify a incremental displacement that we would like to see at a nodal dof and the strategy iterates to determine what the pseudo-time (load factor if using a linear time series) is required to impose that incremental displacement. For this example, at each new step in the analysis the integrator will determine the load increment necessary to increment the horizontal displacement at node 3 by 0.1 in. A target displacement of 6.0 inches is sought.

As the example is nonlinear and nonlinear models do not always converge the analysis is carried out inside a while loop. The loop will either result in the model reaching it's target displacement or it will fail to do so. At each step a single analysis step is performed. If the analysis step fails using standard Newton solution algorithm, another strategy using initial stiffness iterations will be attempted.

# set some parameters
set maxU 15.0;	        # Max displacement
set ok 0
set currentDisp 0.0

# perform the analysis
while {$ok == 0 && $currentDisp < $maxU} {

   set ok [analyze 1]

   # if the analysis fails try initial tangent iteration
   if {$ok != 0} {
       puts "regular newton failed .. lets try an initail stiffness for this step"
       test NormDispIncr 1.0e-12  1000 
       algorithm ModifiedNewton -initial
       set ok [analyze 1]
       if {$ok == 0} {puts "that worked .. back to regular newton"}
	  test NormDispIncr 1.0e-12  10 
	  algorithm Newton
       }
    }