BuildingTcl -- addAnalysisModel: Difference between revisions

From OpenSeesWiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 23: Line 23:
;$AnalysisModelLabel : Unique Analysis Label for reference
;$AnalysisModelLabel : Unique Analysis Label for reference


;$AnalysisTypeLabel : Specifies which AnalysisModel is being used.
;$AnalysisTypeLabel : Specifies which AnalysisType is being used.


;$RequiredArgument1Label $RequiredArgument1Value ... :Labels and corresponding values for AnalysisModel-specific required argument.
;$RequiredArgument1Label $RequiredArgument1Value ... :Labels and corresponding values for AnalysisType-specific required argument.


;$InputArgument1Label $InputArgument1Value … : Labels and corresponding values for AnalysisModel-specific Input Arguments (Optional)
;$InputArgument1Label $InputArgument1Value … : Labels and corresponding values for AnalysisType-specific Input Arguments (Optional)





Revision as of 07:20, 1 November 2009

Commands

addAnalysisModelData AnalysisModelLabel $AnalysisModelLabel
addAnalysisModelData AnalysisTypeLabel $AnalysisTypeLabel
addAnalysisModelData $RequiredArgument1Label $RequiredArgument1Value
addAnalysisModelData $RequiredArgument2Label $RequiredArgument2Value
<addAnalysisModelData $InputArgument1Label $InputArgument1Value>
<addAnalysisModelData $InputArgument2Label $InputArgument2Value>
addAnalysisModel

Different AnalysisTypes have different input arguments:

BuildingTcl -- addAnalysisModel: AnalysisTypeLabel LoadControl
BuildingTcl -- addAnalysisModel: AnalysisTypeLabel DisplacementHistory
BuildingTcl -- addAnalysisModel: AnalysisTypeLabel TimeHistory


Arguments

$AnalysisModelLabel
Unique Analysis Label for reference
$AnalysisTypeLabel
Specifies which AnalysisType is being used.
$RequiredArgument1Label $RequiredArgument1Value ...
Labels and corresponding values for AnalysisType-specific required argument.
$InputArgument1Label $InputArgument1Value …
Labels and corresponding values for AnalysisType-specific Input Arguments (Optional)


Notes

The addAnalysisModel command must be placed at the end of each Analysis-data definition, as it takes all data defined since the last addAnalysisModel command and define the Analysis.


Options


BuildingTcl -- addLoad

Return to BuildingTcl Command Language Manual