What exactly is the correct way to implement the "variable transient" version of the "analyze" command?
Is it the following?:
set ok [analyze 1 $dtMin $dtMax $Jd]
If so, what do $Jd, $dtMin, $dtMax represent?
~Simon
Variable Transient Analysis
Moderators: silvia, selimgunay, Moderators
Re: Variable Transient Analysis
It should be specified this way:
analyze $numIncr $dt $dtMin $dtMax $Jd
where:
$numIncr is number of analysis steps to perform
$dt is a time-step increment
$dtMin is minimum time step increment
$dtMax is maximum time step increment
$Jd number of iterations user would like performed at each step
analyze $numIncr $dt $dtMin $dtMax $Jd
where:
$numIncr is number of analysis steps to perform
$dt is a time-step increment
$dtMin is minimum time step increment
$dtMax is maximum time step increment
$Jd number of iterations user would like performed at each step